Tejon Ranch Water Management and Exchange and Wheeler Ridge-Maricopa Water Storage District 850 Canl/Reservoir 1 Pump-back
    8 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                    
                
        
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
    
                    
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
    
                Summary
                SCH Number
            
            
                2001061013
            
        
                    Lead Agency
            
            
                Wheeler Ridge -Maricopa Water Storage District
                
            
        
                Document Title
            
            Tejon Ranch Water Management and Exchange and Wheeler Ridge-Maricopa Water Storage District 850 Canl/Reservoir 1 Pump-back
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    7/20/2004
                
            
                    Present Land Use
                
                
                    Irrigated agriculture and grazing are the main land uses in the project area.  Most of the project area is zoned as "A" Exclusive Agriculture, and is given a "Resource" designation in the Kern County General Plan.
                
            
                Document Description
            
            The project contains two principal components: (a) Laval Farms (the farming subsidiary of Tejon Ranchcorp (TRC)) Water Management and Exchange, including water right applications to the SWRCB, and (b) WRMWSD's 850 Canal/Reservoir No. 1 Pump-back.  TRC is proposing a long-term Water Management and Exchange to formalize its current and future agricultural water management practices.  The Water Management and Exchange consists of two main components: (1) formalizing TRC's present diversions and re-diversions of water from local streams and beneficial uses of this water for agricultural, resource and irrigation purposes, as specified in the SWRCB Applications 30325 to 30329 and 31043 to 31048 and a Memorandum of Understanding between WRMWSD and TRC; and (2) establishing a long-term agreement between TRC and WRMWSD that is similar to WRMWSD's current User Input Program.  TRC would construct ten new pipelines and nine new weirs to divert water from local creeks as part of the proposed project.  WRMWSD proposes to construct a pump-back facility to pump water from the 850 Canal into Reservoir No. 1 during off-peak energy use hours.  The pump-back facility would require the replacement and extension of an existing pipeline and the installation of a new pump station and possibly a hydroelectric generator to produce electricity during peak hours.
        Contact Information
                        Name
                    
                    
                        William Taube
                    
                
                        Agency Name
                    
                    
                        Wheeler Ridge -Maricopa Water Storage District
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                    Cities
                
                Maricopa
            
                    Counties
                
                Kern
            
                    Cross Streets
                
                
                    Numerous
                
            
                    Zip
                
                
                    93313
                
            
                    Total Acres
                
                
                    ~ 23,200
                
            
                    Parcel #
                
                
                    Numerous
                
            
                    State Highways
                
                
                    I-5
                
            
                    Waterways
                
                
                    Tejon,El Paso,Tunis,Pastoria,Liveoak,Grapevine,Tecuya Creeks;California Aqueduct
                
            
                    Township
                
                
                    Multip
                
            
                    Range
                
                
                    Multip
                
            
                    Section
                
                
                    Multip
                
            
                    Base
                
                
                    Multiple
                
            
                    Other Information
                
                
                    California Aqueduct
                
            Notice of Determination
                        Approving Agency
                    
                    
                        Wheeler Ridge Maricopa Water Storage District                   
                    
                
                            Approving Agency Role
                        
                        
                            Lead Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            Yes
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            Yes
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
