Metro Gold Line Maintenance & Operation Facility/Foothill Extension Improvements
    8 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
                    
                
        
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
    
                    
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
    
    
    
        
                
                    
                        
                    
                
                
                    
                        
                    
                
                
                    
                    
                        
                
                    
                
                    
        
    
    
                Summary
                SCH Number
            
            
                2003061157
            
        
                    Lead Agency
            
            
                Pasadena Metro Blue Line Construction Authority
                
            
        
                Document Title
            
            Metro Gold Line Maintenance & Operation Facility/Foothill Extension Improvements
        
                Document Type
            
            
                NOP - Notice of Preparation
            
        
                Received
            
            
                    Present Land Use
                
                
                    Industrial, Residential, Transportation/Utilities, Commercial, and Vacant
                
            
                Document Description
            
            NOTE: Review extended per lead to July 2, 2010.
The Los Angeles to Pasadena Blue Line Construction Authority/Metro Gold Line Foothill Extension Authority (Authority) prepared an EIS/EIR certified the Final EIR for the Phase 2A Gold Line Foothill Extension in 2007 (SCH# 2003061157).   The Authority will prepare a Supplemental EIR to assess the impacts of a proposed Maintenance and Operation (M&O) Facility designed to support the Metro Gold Line and other light rail transit systems.  Parking Structures at the Monrovia, Irwindale, and Azusa-Alameda stations are also being proposed and/or relocated as well as the realignment of the Mountain Avenue/Duarte Road intersection.  Additional improvements at the Monrovia Station and within the corridor analyzed in the Phase 2A Gold Line Foothill EIR are also proposed.
        Contact Information
                        Name
                    
                    
                        Habib F. Balian
                    
                
                        Agency Name
                    
                    
                        Los Angeles to Pasadena Metro Blue Line Construction Authority
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                    Cities
                
                Arcadia, Azusa, Claremont, Duarte, Glendora, Irwindale, La Verne, Monrovia, Montclair, Pasadena, Pomona, San Dimas
            
                    Counties
                
                Los Angeles
            
                    Cross Streets
                
                
                    S. California Avenue, Duarte Road, Shamrock Avenue, Irwindale Avenue,Alameda Avenue
                
            
                    Zip
                
                
                    91016
                
            
                    Total Acres
                
                
                    27
                
            
                    Parcel #
                
                
                    multiple
                
            
                    State Highways
                
                
                    I-210, 605
                
            
                    Railways
                
                
                    Burlington N. Santa Fe
                
            
                    Airports
                
                
                    Brackett Airport
                
            
                    Waterways
                
                
                    San Gabriel River, Santa Anita Wash
                
            Notice of Completion
                        State Review Period Start
                    
                    
                        State Review Period End
                    
                    
                        State Reviewing Agencies
                    
                    Air Resources Board, Transportation Projects, California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 7 (DOT), California Highway Patrol, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Resources Agency, California Native American Heritage Commission (NAHC)
                
                            State Reviewing Agency Comments
                        
                        California Native American Heritage Commission (NAHC)
                    
                        Development Types
                    
                    Transportation:Rail (Light Rail Transit)
                
                        Project Issues
                    
                    Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian
                Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
