Napa River Tributary Bridge Replacement
Summary
                SCH Number
            
            
                2003069003
            
        
                    Lead Agency
            
            
                Fish & Game #3
                
            
        
                Document Title
            
            Napa River Tributary Bridge Replacement
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    6/3/2003
                
            
                Document Description
            
            The project is the removal and replacement of an existing wooden bridge that crosses an unnamed tributary to the Napa River between the Joseph Phelps Vineyards River Ranch farming headquarters and the recently constructed River Ranch Farmworker Housing Center located west of Silverado Trail, approximately 0.4 miles north of Talpin Road in Napa County.  The wooden bridge will be replaced with a new precast concrete bridge with concrete abutments placed beyond the top of bank of the existing stream channel.  The existing bridge consists of stone abutments that were built into the original stream channel many years ago.  As part of this project, these stone and concrete abutments will be completely removed from the watercourse to allow the channel to return to its natural form.   The only work to be performed within the watercourse will be the removal of the exisitng bridge and abutments.  Construction of the new bridge abutments and placement of the new bridge will be performed entirely outside of the stream channel.  The construction of the proposed bridge replacement will begin in July, 2003 and take approximately one to two months to complete.  All construction within the watercourse will take place when the stream is dry.
        Contact Information
                        Name
                    
                    
                        Heather McCollister
                    
                
                        Agency Name
                    
                    
                        Department of Fish and Game, Region 3
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Address
                        
                        
                    
                            Phone
                        
                        
                    Location
                    Counties
                
                Napa
            Notice of Determination
                        Approving Agency
                    
                    
                        California Department of Fish and Game                          
                    
                
                            Approving Agency Role
                        
                        
                            Responsible Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            N/A
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            N/A
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            N/A
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
