Mission Soledad Shopping Center
Summary
                SCH Number
            
            
                2003069018
            
        
                    Lead Agency
            
            
                Fish & Game #3
                
            
        
                Document Title
            
            Mission Soledad Shopping Center
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    6/9/2003
                
            
                Document Description
            
            The proposed project would construct a storm drain system for the proposed shopping center and connect the new system into the existing outlet. The new storm drain system would be constructed using 48-inch diameter high-density polyethylene pipe (HDPE) tied into the existing outlet, which would be replaced using a 60-inch HDPE culvert with a flared end section. A concrete bulkhead would be constructed to support and anchor the outlet in place. Rock slope protection, approximately 12-inches in diameter, would be placed at the outlet to dissipate the energy of water exiting the flared end section. Oil and grease separators would be installed in the system and maintained at appropriate intervals to reduce or eliminate the introduction of petroleum-based pollutants into the Salinas River. A minor amount of riparian willow habitat would be trimmed to allow access to the site. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number 1600-2003-0122-3 pursuant to Section 1603 of the Fish and Game Code to the project operator.
        Contact Information
                        Name
                    
                    
                        Bill Farrel
                    
                
                        Agency Name
                    
                    
                        Department of Fish and Game, Region 3
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Address
                        
                        
                    
                            Phone
                        
                        
                    Location
                    Cities
                
                Soledad
            
                    Counties
                
                Monterey
            Notice of Determination
                        Approving Agency
                    
                    
                        California Department of Fish and Game                          
                    
                
                            Approving Agency Role
                        
                        
                            Responsible Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            N/A
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            N/A
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            N/A
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.