L38-536 Mountain View Avenue Pipelien Replacement; SAA 2013-0059-R4
    14 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
    
                
                    
                    
                
            
                
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
    
                Summary
                SCH Number
            
            
                2004111084
            
        
                    Lead Agency
            
            
                Tulare County
                
            
        
                Document Title
            
            L38-536 Mountain View Avenue Pipelien Replacement; SAA 2013-0059-R4
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    9/30/2013
                
            
                Document Description
            
            The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, Southern California Gas Company.  The applicant proposes to conduct horizontal directional drilling in order to install a new 4-inch high pressure main pipeline (line 38-536).  Horizontal directional drilling at each waterway crossing will consist of two (2) excavations, a receiving hole and an entrance pit.  These pits will be located approximately 100 feet on either side of the water crossings.  The horizontal directional drill will be a minimum of 10 feet below the bottom of the channel.  A frac-out contingency plan and materials will be kept on the job site during all activities.  At the conclusion of work, the directional drill locations will be restored to pre-existing contours and conditions.
        Contact Information
                        Name
                    
                    
                        Kyle Stoner
                    
                
                        Agency Name
                    
                    
                        California Department of Fish and Game, Central Region
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                        Coordinates
                    
                    
                
                    Cities
                
                Dinuba
            
                    Counties
                
                Fresno
            
                    Cross Streets
                
                
                    Avenue 416 from Bethel Avenue to Road 92
                
            
                    State Highways
                
                
                    99
                
            
                    Railways
                
                
                    Southern Pacific Railroad
                
            Notice of Determination
                        Approving Agency
                    
                    
                        DFG                                                             
                    
                
                            Approving Agency Role
                        
                        
                            Responsible Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
