Subsurface Intake System Feasibility Investigation Test Slant Well
    5 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
    
                
                    
                    
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
    
                Summary
                SCH Number
            
            
                2008051050
            
        
                    Lead Agency
            
            
                Orange County Municipal Water District
                
            
        
                Document Title
            
            Subsurface Intake System Feasibility Investigation Test Slant Well
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    4/2/2012
                
            
                Document Description
            
            In 2006, MWDOC successfully constructed a fully buried 12" diameter, 350' long test slant well on Doheny State Beach. Long-term testing is needed to validate and fine tune the groundwater model, to verify the anticipated flow splits between brackish and ocean water, establish water quality and microbial parameters, and to establish a full-scale desalination process design. Phase 3 pilot-plant testing and water quality testing will measure changes in salinity and other water quality parameters affecting Reverse Osmosis process performance. The State Lands Commission action is two-year Extended Lease through May 31, 2014.
        Contact Information
                        Name
                    
                    
                        Drew Simpkin
                    
                
                        Agency Name
                    
                    
                        California State Lands Commission
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                        Coordinates
                    
                    
                
                    Cities
                
                Dana Point
            
                    Counties
                
                Orange
            
                    Cross Streets
                
                
                    25300 Dana Point Harbor Drive
                
            
                    Zip
                
                
                    92629
                
            
                    State Highways
                
                
                    1 (Pacific Coast Highway)
                
            
                    Schools
                
                
                    St. Edward School
                
            
                    Waterways
                
                
                    Pacific Ocean
                
            
                    Township
                
                
                    8S
                
            
                    Range
                
                
                    8W
                
            Notice of Determination
                        Approving Agency
                    
                    
                        California States Lands Commission                              
                    
                
                            Approving Agency Role
                        
                        
                            Responsible Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
