FFMP Phoenix Lake Road Pipeline Seismic Reliability Project
    7 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
    
                    
                
            
                
            
                
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
    
                Summary
                SCH Number
            
            
                2009112070
            
        
                    Lead Agency
            
            
                Marin Municipal Water District
                
            
        
                Document Title
            
            FFMP Phoenix Lake Road Pipeline Seismic Reliability Project
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    5/18/2010
                
            
                Document Description
            
            The project would replace an existing 18 inch diameter welded steel pipe installed in the 1950's and a 12 inch diameter cast iron pipeline installed in the 1920's in the Corte Madera Creek watershed above the Town of Ross.  The segment of pipeline proposed for replacement would extend ~3,600 ft from intersection of the unpaved Shaver Grade, Fish Grade, and Phoenix Lake Roads in the west to the Ross Reservoir in the east (APN 197-120-04, 197-120-23, & 197-120-35). 
The project would also replace 7 existing drainage culverts that discharge within the Fairfax Creek and Corte Madera Creek Watersheds: two on Concrete Pipe Road, one on Shaver Grade Road, and 4 on Phoenix Lake Road (APN 197-120-04, 197-120-23, 197-120-35).  The goal of replacing the existing culvert is: 1) to reduce the potential sediments that would be delivered to a creek or reservoir by a culvert failure; and 2) to protect the road and buried pipeline from a potential culvert failure.  The new culvert installations would meet current best management practices for roads and trails and would provide more assured access to watershed and District facilities.
        Contact Information
                        Name
                    
                    
                        Dain Anderson
                    
                
                        Agency Name
                    
                    
                        Marin Municipal Water District
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                    Cities
                
                Ross
            
                    Counties
                
                Marin
            
                    Parcel #
                
                
                    197-120-04, 23, 35
                
            
                    State Highways
                
                
                    US 101
                
            
                    Schools
                
                
                    Ross ES
                
            
                    Waterways
                
                
                    Corte Madera Creek
                
            Notice of Determination
                        Approving Agency
                    
                    
                        Marin Municipal Water District                                  
                    
                
                            Approving Agency Role
                        
                        
                            Lead Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            N/A
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
