Folsom Dam Safety and Flood Damage Reduction - Folsom Dam Raise
Description
The Folsom Dam Raise Project is a cooperative effort between the U.S. Army Corps of Engineers, the State of CA CVFPB, and the Sacramento Area Flood Control Agency to provide enhanced flood risk protection to the Sacramento Metropolitan Area. Construction of Alternative 2 (the preferred alternative) would include 1) raising the crest elevations of the existing earthen embankment dikes (Dikes 1-8) and the Mormon Island Auxiliary Dam by 3.5 feet; 2) raising the crest elevation of the right and left wing dams by adding concrete floodwalls; and 3) making refinements to the Folsom Dam's spillway Tainter gates and other structural modifications to the dam. CVFPB has adopted mitigation measures for the project.
Download CSV New Search

 

25 documents in project

Type Lead/Public Agency Received Title
Central Valley Flood Protection Board American River Watershed - Folsom Dam Raise Project
Central Valley Flood Protection Board American River Watershed - Folsom Dam Raise Project
Central Valley Flood Protection Board Folsom Dam Safety and Flood Damage Reduction - Folsom Dam Raise
Central Valley Flood Protection Board Folsom Dam Safety and Flood Damage Reduction - Folsom Dam Raise
Central Valley Flood Protection Board Folsom Dam Modification, Phase V Site Restoration and Related Mitigation Activities Project
Central Valley Flood Protection Board Folsom Dam Modifications Project - Phase V Site Restoration and Related Mitigation Activities
Central Valley Flood Protection Board Folsom Dam Safety and Flood Damage Reduction - Folsom Dam Raise
Central Valley Flood Protection Board Folsom Dam Joint Project - Flood Control and Dam Safety
Central Valley Flood Protection Board Folsom Dam Safety & Flood Damage Reduction - Right Bank Stabilization
Central Valley Flood Protection Board Folsom Dam Safety & Flood Damage Reduction - Right Bank Stabilization
Central Valley Flood Protection Board Folsom Dam Safety & Flood Damage Reduction - Right Bank Stabilization
Central Valley Flood Protection Board Folsom Dam Safety and Flood Damage Reduction - Evening Rock Blasting
Central Valley Flood Protection Board Folsom Dam Safety & Flood Damage Reduction - Right Bank Stabilization
Central Valley Flood Protection Board Folsom Dam Safety & Flood Damage Reduction - Prison Staging Area & Stilling Basin Drain
Central Valley Flood Protection Board Folsom Dam Safety & Flood Damage Reduction - Prison Staging Area & Stilling Basin Drain
Central Valley Flood Protection Board Folsom Dam Safety & Flood Damage Reduction - Prison Staging Area & Stilling Basin Drain
Central Valley Flood Protection Board Folsom Dam Safety and Flood Damage Reduction-Early Approach Channel Excavation
Central Valley Flood Protection Board Folsom Dam Safety and Flood Risk Management - Control Structure, Chute, and Stilling Basin Work
Central Valley Flood Protection Board Folsom Dam Safety and Flood Damage Reduction-Early Approach Channel Excavation
Central Valley Flood Protection Board Folsom Dam Safety and Flood Damage Reduction-Early Approach Channel Excavation
Central Valley Flood Protection Board Folsom Dam Safety and Flood Damage Reduction
Central Valley Flood Protection Board Folsom Dam Safety and Flood Damage Reduction
Central Valley Flood Protection Board Folsom Dam Joint Project - Flood Control and Dam Safety
Central Valley Flood Protection Board Folsom Dam Safety and Flood Damage Reduction